Timeline

This is a work in progress of getting all this info posted here.   I will remove this warning when I have everything posted, and will post new events as they happen going forward.

Events

2016
Sep 01

Paid Rent

Paid $4705 to Landlord, Total rent paid without occupancy is $23,525.

Aug 01

Paid Rent

Paid $4705 to Landlord, Total rent paid without occupancy is $18,820.

Jul 30

Revised building electrical plans provided by Landlord

This is the last one they send to me Sent from Yahoo Mail for iPhone Begin forwarded message: On Friday, July 22, 2016, 5:08 PM, Josh Heinz <josh@heinzassociates.net> wrote: Masoud, Joe: Attached are drawings showing the multiple revisions that have been made since the original drawings were approved by IBI. ..Read More

Jul 29

Asking for new set of electrical plans

Plans provided didn’t match what was actually installed in the building. Masoud, Is this the latest that was filed?  It references a disconnect switch (which is there) and a lack of the 400A panel which I know you have had installed. Thanks, Adam

Jul 27

Forwarded electrical plans

Overall building electrical plans shared with us Sent from Yahoo Mail for iPhone Begin forwarded message: On Monday, February 15, 2016, 1:00 PM, Josh Heinz <josh@heinzassociates.net> wrote: Masoud, The electrical drawings for this project are ready to be submitted.  I can submit these to IBI tomorrow (2/16). A few changes..Read More

Jul 25

Invoice for Mechanical Drawings

Attached is the invoice for the mechanical plans and W-9. Any questions, please let me know. Thx, Matt  

Jul 01

Paid Rent

Paid $4705 to Landlord, Total rent paid without occupancy is $14,115.

Jun 29

Forwarded Landlords response to Mech Engineer

 ———- Forwarded message ———- From: masoud jalilvand <masoudjalil@yahoo.com> Date: Tue, Jun 28, 2016 at 5:26 PM Subject: Re: Seating To: Adam Lorenz <adam@tapandscrew.com> That is fine with me But usually they cover any changes or revision if the plan is not accepted by city Thanks madoud Sent from Yahoo Mail for iPhone

Jun 28

Mechanical Design Proposal

Masoud, Please see the attached proposal from Matt for mechanical design. Thanks, Adam ———- Forwarded message ———- From: matt farrell <mjfarrell@fuse.net> Date: Tue, Jun 28, 2016 at 3:42 PM Subject: RE: Seating To: Adam Lorenz <adam@tapandscrew.com> Adam,   Attached is our proposal for the scope of work we discussed yesterday.   Please..Read More

Jun 17

Permission to talk to HVAC guy

Landlord was leaving country so had to contact and meet these people for him Hi Adam As we discussed Clark Hvac information is included Clark Heating & Cooling, Inc. 28 Glendale-Milford Rd. Milford, OH 45150 clarkheating@cinci.rr.com 513-831-3443 I already takes to Larry and he know you may contact him regarding..Read More